Skip to Content

Flagger request

At McKinnon, every request counts. 

For any flagger request, 
please leave us your contact information and we will get back to you as soon as possible.

Mailing address*
City*
Postal code*
Province*
First name
Last name
Choose an option
Numéro et rue
City
Postal code
Rue 1
Rue 2
City
Postal code
Choose an option
McKinnon turnkey = planning, installation and removal. Otherwise the client provides and installs their own signage.
Required if you provide your own signage. PDF or image, max 5 MB, up to 2 files.
I release McKinnon from installing the signage and I commit to providing a compliant, safe worksite for the flaggers.
I accept
No
Separate from the meeting point. If yes, a signed and sealed plan is mandatory (not only a normalized sheet).
Last name
Required when intersections must be controlled. Engineer signed and sealed plan (not only a normalized sheet).
No
No
No
Choose an option
Choose an option
E.g. good, potholes, snow-covered, under construction…
No
McKinnon flaggers never perform reversing (backing) manoeuvres. Dual roles ("two hats") are not allowed. The flagger's role and attire change depending on the work.
Last name
First name
Phone number
TCD-012 (3- or 4-lane undivided road — right-lane obstruction) may apply depending on the layout. A surcharge may apply.
I accept
The TCD-005B (alternating traffic with flagger barrier) is required in any zone over 70 km/h. A surcharge will apply.
I accept
Maximum file size: 1 MB